System relocation @ Golden Triangle Part II

On the second day, which is a Saturday, we still have one more day before the customer actually start moving. And so, today, with all the phone and data cables ready, our job is to prepare for the electrical cables. Its not easy as it seemed because these cables would be used to power at least ten tables. And so, we had to get the power directly from the main fusebox and nowhere else. No short cuts here, such as tapping from the nearest power point or else there would be problems.

Luckily I told them to take everything back the night
before as by the time we arrived, there were another
crew polishing the tiles and it was wet everywhere.

Full force today, since it was a Saturday and there's not
much customers to visit. There is also a reason why:
The
electrical cables were tough and not flexbile. So,
its difficult
to get them to where we want them to be.

Also, the conduits were jam packed with other cables as well.

Some shots from my Nokia 5800 as my Nikon D50 was
kept in the customer's office. If I delayed this for a few
more minutes, the clouds would have moved.

I do not know why I was so intrigued with the moving
algae in the pond on the first day.....

No comments: